A cartoning-machine support plan should state who completes routine checks, which planned tasks require maintenance competence, what information is recorded, which spares are held and how a recurring fault is escalated. The plan should cover the complete operating system rather than treating every stop as a cartoner-only problem.
Start with the approved machine documentation, format records, settings, drawings and handover evidence. Identify the tasks that keep the machine in its accepted condition and the observations that reveal deterioration before a failure. This can include inspection of wear surfaces, fasteners, belts, chains, vacuum components, guides, sensors, guarding and the approved lubrication points where applicable to the supplied machine.
Do not turn a general checklist into an unsupported maintenance interval. The actual frequency depends on the machine design, operating hours, product and carton contamination, washdown or cleaning practices, stop/start pattern and the manufacturer’s instructions. Record each task against the real machine and revise the plan when evidence shows a different interval is justified.